SWIM Project Waterharmonica Study tour The
Netherlands, 19 and 20 September 2013
![]() |
![]() |
The study tour has been organised by the Netherlands Waterplatform
Waterharmonica information:
The Stowa report: Waterharmonicas in the Netherlands (1996-2012): link
An older Stowa report on the Waterharmonica in the "developing world": link
The presentations on the Waterharmonica during the field visit:
Ruud Kampf: Presentation
non conventional low-cost wastewater treatment, The Waterharmonica ,
introduction to field day on Friday
The most recent international presentation on the Waterharmonica was for ecolgists during the Centre for wetland ecolgy symposium on Ghent, Belgium on 3 July 2014: link
The route of the excursion:
download the route + location of the visted to Google Earth: link
Participants
Title |
Name |
Surname |
Position |
Country |
Mr |
Mohammed |
Dergaoui |
Chef de Service Assainissement,
Ministere Des Ressouces En Eau |
Algeria |
Madame |
Nassima |
Rouag nee Bagtache |
Chef de projet, Office National de
l’Irrigation et du Drainage (ONID) |
Algeria |
Mr |
Benyoucef |
Ferhat |
Directeur de zone - Exploitation -
Office national de l' assainissement |
Algeria |
Mr |
Oleg |
Henkin |
Head of Projects Control Branch -
Sewerage Infrastructures Development Administration - The Governmental
Authority for Water and Sewage |
Israel |
Mrs |
Mona |
Sleiman |
Senior Engineer ,Ministry of Energy
and Water-General Directorate of Hydraulic and Electric Resources |
Lebanon |
Mrs |
Nazmie |
Beydoun |
Civil Engineer -Environment Department
– Wastewater Treatment Plants and Networks, Ministry of Energy and Water |
Lebanon |
Mr |
Moulay Abid |
Lekbiri |
Chef Service Eau,
Service Eau – DPET d’El Kelaa des Sraghna, Ministère de l’Energie, des
Mines, de l’Eau et de l’Environnement |
Morocco |
Mr |
Nael |
Aliahmad |
Project Leader , Palestinian Water
Authority - PWA |
Palestine |
Mr |
Sulaiman |
Abu Ghosh, Saed |
Project Manager for Implementation of
WWTPs West and East and Reuse projects – Water Supply and Sanitation
Department |
Palestine |
Mr |
Emil |
Abdou |
Water and Environmental Engineer -
Operation Department at Jerusalem Water Undertaking (JWU) |
Palestine |
Mr. |
Francisco |
Pedrero |
Coordinator SWIM project |
Spain |
Day 2 –
Thursday 19-09-2013
Afternoon |
||||
Date/Time |
Activity |
Organisation/participant |
Transport / accommodation |
|
Time: 15:00 – 18:00
[180 min]
[60 min]
[30 min]
[15 min]
[75 min]
[15 min]
[40 min]
[20 min] |
Seminar: non conventional (low cost) wastewater treatment for rural
areas and water reuse; examples from the Netherlands
-
Project examples & innovations
from the Netherlands - Pitch project IRIS, sludge treatment (MD) + modular
systems - Pitch project Modular Cyclobe watertreatment - Pitch project Biotrap
-
Q&A with discussion
-
Coffee break
-
Translation to the local context
-
Presentation Master plan Jordan
Valley + FDW project
-
Presentation non conventional
low-cost wastewater treatment, The Waterharmonica , introduction to
field day on Friday
-
Q&A with discussion
|
Efteling Golfpark
Mr. B. Meeuwsen,
Hellebrekers Technieken
Mr. E. Lamberts,
BTN International
Mr. R. Neef,
Brightwork
Mr. J. Kool,
Royal HaskoningDHV
Mr. R. Kampf,
Rekel/water
|
|
|
Time: 18:00 –
20:00
|
Networking Drinks (non-alcoholic) |
Efteling, Grand Café
|
|
|
Time: 20:00
|
Transport to Hotel (Waalwijk) – NH Waalwijk
|
Mrs.
E. Kyriakakou
|
Approximately 5 min drive by bus
|
|
Day 2 –
Friday 20-09-2013 - morning |
Waterharmonica tour – organizer: mr. R. Kampf,
Rekel/water |
|||
Date/Time |
Activity |
Organisation/participant |
Transport / accommodation |
|
Time: 09:00 –
09:15
[15 min] |
Transport to WWTP Kaatsheuvel
Kaatsheuvel – Kaatsheuvel
(Erasstraat 76, 5171 VG)
|
Mrs.
E. Kyriakakou
|
Approximately 10 min drive by bus
|
|
Time: 09:15 –
10:00
[45 min] |
Tour WWTP Kaatsheuvel
-
Upgrading of the well treated
waste water (continuous sand-filter with P-removal) to be used in De
Efteling
-
|
WWTP Kaatsheuvel
Mr. H. Mollen,
Water Board Brabantse
Delta
Mr T. Schomaker,
Royal
HaskoningDHV
|
||
Time: 10:00 – 10:15
[15 min] |
Transport to Klaterwater Efteling Golf Park
Kaatsheuvel – De Moer/Kaatsheuvel
(Veldstraat 6, 5176 NB)
|
Mrs.
E. Kyriakakou
|
Approximately 5 min drive by bus
|
|
Time: 10:15 –
11:30
[60 min] |
Tour Waterharmonica Klaterwater
-
Short Presentation on treatment
of effluent (sand-filter + biological system)
-
Presentation Klaterwater and upgraded treated waste water to a source of
water for the leisure park and golf course De Efteling
-
Short
tour Subsurface Constructed wetland and pond treatment
|
Efteling Golfpark, room Kraanven
Klaterwater
Mr. M. Dieltjes,
Efteling
Mr T. Schomaker,
Royal HaskoningDHV
|
||
Time: 11:30 – 12:00
[30 min]
|
Transport to WWTP Tilburg Noord
Kaatsheuvel – TIlburg
|
Mrs.
E. Kyriakakou
|
Approximately 15 min drive by bus
|
|
Time: 12:00 – 12:30
[30 min] |
Tour WWTP Tilburg-Noord, Waterharmonica |
Mr. A. Verschoor, Waterboard
De Dommel
|
|
|
Time: 12:30 – 12:45
[15 min] |
Transport to Moerenburg
Tilburg – Tilburg
|
Mrs.
E. Kyriakakou
|
Approximately 15 min drive by bus
|
|
Day 2 –
Friday 20-09-2013 afternoon |
Waterharmonica tour – organizer: mr. R. Kampf, Rekel/water |
|||
Date/Time |
Activity |
Organisation/participant |
Transport / accommodation |
|
Time: 12:45 – 13:30
[45 min]
|
Lunch at Moerenburg
Café Zomerlust |
|
|
|
Time: 13:35 – 13:45
[10 min]
|
Transport to WWTP Tilburg Moerenburg
Tilburg – Tilburg (Vloeiveldweg 2,
5048 TD)
|
Mrs.
E. Kyriakakou
|
|
|
Time: 13:45 – 14:15
[30 min]
|
Tour WWTP Tilburg-Moerenburg, Stormwaterharmonica
|
WWTP Tilburg Moerenburg
Mr. A. Verschoor, Waterboard
De Dommel
|
|
|
Time: 14:15 – 15:00
[45 min]
|
Transport to WWTP Soerendonk
Moerenburg – Soerendonk (Perkstraat
1, 6027 RC)
|
Mrs.
E. Kyriakakou
|
Approximately 90 min drive by bus
|
|
Time: 15:00 – 16:30
[90 min] |
Tour WWTP Soerendonk
-
Presentation Waterharmonicas in Water Board De Dommel
-
Tour
Waterharmonica Soerendonk
|
WWTP Soerendonk
Mrs. G. Matte,
Waterboard De Dommel
|
|
|
Time: 16:30 – 18:00
[90 min]
|
Transport to hotel (Amsterdam)
– Novotel Amsterdam City
|
Mrs.
E. Kyriakakou
|
Approximately 90 min drive by bus
|
|
page made by: Ruud Kampf, Rekel/water, consultant Waterharmonica processes